Chapter 23A SURFACE MINING AND RECLAMATION
23A-13 Violations and penalties.
If the planning director, based upon an annual inspection or
otherwise confirmed by an inspection of the mining operation, determines that a
surface mining operation is not in compliance with this chapter, the applicable
use permit, any required permit and/or the reclamation plan, the city shall
follow the procedures set forth in Public Resources Code, sections 2774.1 and
2774.2 concerning violations and penalties, as well as those provisions of the
city zoning ordinance for revocation and/or abandonment of a use permit which
are not preempted by SMARA. (Ord. No. 1606, § 2 (part).)