23-144 Procedures.

(a) Filing and Processing. A vesting tentative map shall be filed in the same form and have the same contents, accompanying data and reports, and shall be processed in the same manner as set forth in the Oroville subdivision ordinance for a tentative map except as hereinafter provided:
(1) At the time a vesting tentative map is filed it shall have printed conspicuously on its face the words “Vesting Tentative Map.”
(2) At the time a vesting tentative map is filed a subdivider shall also supply the following information:
(a) Height, size, and location of buildings;
(b) Sewer, water, stormdrain and road details:
(c) Information on the uses to which the buildings will be put;
(d) Detailed grading plans;
(e) Geological studies;
(f) Flood control information;
(g) Architectural plans;
(h) Landscaping and irrigation plans;
(i) Any other studies Oroville has normally deferred to the building permit stage.
(b) Fees. Upon filing a vesting tentative map, the subdivider shall pay the fees required by the resolution setting fees for the filing and processing of a tentative map.
(c) Expiration. The approval or conditional approval of a vesting tentative map shall expire at the end of the same time period, and shall be subject to the same extensions, established by the subdivision ordinance for the expiration of the approval or conditional approval of a tentative map. (Ord. No. 1475, § 1 (part).)